[63][64] However, this plan may need to be delayed because of the discovery of utility conflicts in late 2022; the revised plan would be bus substitution of the 501 Queen streetcar for up to 20 months, starting in May 2023. Leveling above a point is done no more than traditional instrument procedures. Some total stations provide from level warnings to the operator. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying.
How to use a total station for setting out pdf Press the "Power" button to turn on the instrument if it isn't already on. SITENG - Setting Out #7 "Stakeout" In today's video I am showing how to use the Stakeout program using a Total Station. As of June2021[update], Metrolinx has not indicated the location of entrances and exits for this station. Operating distance range - of remote control (diameter): 5 - 328 ft. IP protection class: IP 55 (EN 60529) D. Total Station Instruments 2.5.12 2-06 Tapes A. Leica UK Quick Guides Surveying, Setting-Out on your TPS 800 Series Total Station Most of this guide will be relevant for the TPS300, 400 and 700 series also but some functions may vary slightly. Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Last updated Save as PDF Share Setting-out with As-Built Setting-out Points if Control Points are Available Setting-out Points if Control Points are Not Available Setting-out Axes (Batter Board) A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. The Ontario Place station was eliminated, with an Exhibition station added near the Exhibition GO Station. [52] The government also claims the alternate technology will reduce construction time and cost, as single tunnels rather than dual tunnels could be utilized. Electronical Total Station Congratulations on your purchase of a new Leica Geosystems Total Station. In downtown Toronto, station stands on Front Street West on the south side of the block bordered by Bay Street and York Street. Continuing west on an elevated structure, the line would curve south over Millwood Road across the Don Valley on a new bridge roughly parallel and west of Leaside Bridge. Quit out of Survey 29. Safer, smarter, and more efficient mining. [46], East Harbour station will be an intermodal station with GO Transit trains and will be located between Eastern Avenue and the Don River along GO Transit's Lakeshore East / Stouffville rail corridor. Prism Pole, For Surveying, Total Station, Sokkia, Topkon, Trimble, Leica 2.6 meter; Leica charger GKL341 original for all battery; Archives.
SET1X SET2X SET3X SET5X Total Station Class 3R Laser Product SURVEYING INSTRUMENTS OPERATORS MANUAL Thank you for selecting the SET1X/2X/3X/5X. 1 How to Set Up Builder to Gain a Known Station 16 1.1 Set Up Anywhere Based on Given Control Line 16 1.2 Set Up over Control Line 18 1.3 Set Up Anywhere with Given Coordinates 20 1.4 Set Up over One Known Point with Second Known Point 24 1.5 Set Up Using Nails from Profile Boards 28. Metrolinx would help relocate businesses within Thorncliffe Park. [57], East Harbour station will be built along the existing railway embankment. Jobs & Data. Sokkia Total station setup and operation 1. Total Station Survey System (TSSS) Survey Specications SEPTEMBER 2006 change in temperature will cause a one ppm error, if the ppm setting in the total station is not changed. Tail tracks will extend west of the platforms to Dufferin Street for storing and turning back trains and a possible future extension. Repeatability results showed, however, that cm-level differences in coordinate Mechanical and electrical construction Total stations have become the highest standard for most forms of construction layout. SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. The station is at the western of the two intersections.) The hands-on experience is invaluable in understanding the more abstract concepts associated with mathematics and instrument operation. Builder, Table of Contents 3 2 How to Set Up Builder with Height 32 2.1 Transfer Elevation to Builder In the outer range limitations, bicycle reflector tape (. There is a zero point of reference called a total station. Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 January 2005 Total Station System (TSS) Survey Specification 9-04 Second Order . Angle-distance method to stake out the horizontal alignment by total station, Assuming that the total station with reflector is the tool that it is intended to lay out the circular curve after being designed then the only way to do so is to construct a table that contains angle-distance values. A total station is an electronic/optical instrument used in modern surveying. The GO Transit rail corridor will be on the east side of the Ontario Line tracks, but there will be no GO Transit railway station here. [54] There are plans for an additional station entry directly from Danforth Avenue. Staking out with a Total Station First the instrument is oriented, and a file that contains control points and stake points information is downloaded into the total station. This is done by using motors to aim and position the instrument. All control points used for data gathering and stake out, including photo control, are adjusted by the method of least squares. . In the meantime, archeologists were allowed on site to document any historical findings. Only one entrance is planned, and plans for an emergency exit are not yet known. Any point pertaining to a project may be located on the ground and on the plans by itsStationand the number of feet (Offset) LEFT or RIGHT of theSurveyC/L.
How to Stake Out with a Total Station - Career Trend Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. Construction total stations support the various phases of stake-out tasks in the construction of gas utility infrastructure. Furthermore, fine pointing is aided by having unlimited travel in the manually, because they are servo-driven, they have friction clutches that afford great speed in point, as there are no locks to be adjusted.
TinySurveyor World's Fastest Robot for Stake Out This discussion provides general guidance on the use of total stations on topographic surveys. Compute and tabulate curve notes to stake out the alignment from the TS to ST at full stations using a total station and the deflection-angle, total chord method. We couldnt be happier! [55]:1:24:00, Gerrard will be located diagonally over the intersection of Gerrard Street East and Carlaw Avenue west of the Gerrard Square shopping mall. However, regardless of how technologically advanced the Total Station is built, it takes a competent surveyor to ensure an accurate and precise instrument station set-up. Introduction This Total Station Training Manual is intended to help you understand and get the most out of the Sokkia Total Station that you have chosen. The station will service a future office development. A total station is a device that you can use to plot out an area of land before you begin construction. Then shoot the laser at the reflector with SEARCH by hitting the F1 key. pegs, nails, rope or line, hammer, tape, marking tool etc) Firstly, take note of the four corners where we have the proposed columns/pillars or as case might be. The process for staking out points begins by setting up the device at known coordinates, as described above. The Ontario Line was announced by the Government of Ontario on April 10, 2019. [46], Originally named Leslieville, RiversideLeslieville will be located on the railway bridge over Queen Street East on the boundary between the Riverside (west side) and Leslieville (east side) neighbourhoods. Otherwise, the EDM part of this instrument will be damaged. Enter the coordinates of the point. The instrument is costlier than other conventional surveying instruments. Parts of a total station.
TPS02 06 - Survey machine manual - Starting the Survey Using TS 06 Plus With this device, one can determine angles and distances from the instrument to the points to be surveyed. Most use a three-screw, forced-centering Wild-type tribrach bracket to fasten and align the total station together with the tripod. Advantages of Using Total Stations. Controlling Vertical Towers w3.leica-geosystems.com Accuracy of measurement is high. This 3-day course comprises days 3-5 of the 5-day course, Setting Out For Construction. How to create a . Export out of Data Once you have completed your Survey return to the main menu and select your job and select export data. Other stations have connections to Toronto Transit Commission streetcar and bus services. All control points used for data gathering and stake out, including photo control, are adjusted by the method of least squares. Computers can be employed for map making and plotting contour and cross-sections. Turn the total station until the horizontal circle reads . [45], South from Pape station, the line would travel roughly under Pape Avenue, emerging to the surface just north of Gerrard Street. Leica iCON iCR80. Angle typical errors range from t 1 to t 5 according to a Direct and Reverse set. [17] In early 2019, the Ontario government announced its intention to take over subway construction in Toronto from the TTC. STN for station points, CB for corner The line will pass diagonally under the southeast corner of the intersection. [30], The Ontario Line project is being delivered through various publicprivate partnerships (P3), progressive designbuild and traditional procurement contracts, which are all being staged accordingly for their successful delivery. Determination of Remote height using total station 12. It will work better if can use a It will work better if can use a prism and if available activate the LN-100 is effectively used for installing bases of solar panels Company YOUSUN, in Tsu, Mie, Japan, is an equipment installation construction company that specializes in general civil engineering works, as well as installation projects of water and sewer and social infrastructure equipment. After the position of the total station was identified, the 12 points of the specified building positions assigned were added in the data collector and then staked out. It is useful for measuring horizontal angles, vertical angles, and distance it does this by analyzing the slope between itself and a specific point. Selection Snapshot list and select Delete. This will allow you to choose a point in the area and instantly know where that point lies in relation to the location of the total station . Manual Total Stations It was necessary to read the horizontal and vertical angles manually in this type of instrument. Now Move the Instrument until comes . Press F4 (Start). 16-2, Minamikamata 2-chome, Ota-ku Tokyo 144-0035 Japan Notices USA FCC 15B Class B satisfied. Metrolinx kept the project a secret until the government chose to announce it on April 10. 30. Extract and relate coordinate information from drawings. Lets take a look at the steps involved to properly set up and level the Trimble Total Station. Adjust the total station where necessary. They feel both the vertical and horizontal angles electronically and measure the slope distances, compute the vertical and horizontal components of those these spaces, and then determine the coordinates of observed points. This manual contains important safety directions (refer to section Safety directions) as well as instructions Refer to Safety Directions for further information.
Stake-out without coordinates data! | Positioning | TOPCON [71], The portal to the tunnelled portion of the line will be just east of the station platforms. A 30X optical zoom is not uncommon on many total stations. In the mid-2010s, the City of Toronto developed plans for this line, known as the "Relief Line South",[a] between Pape station on Line 2 BloorDanforth and Osgoode station on Line 1 YongeUniversity. In the case of traversing or other control survey functions, the servo drives can be used to point the instrument in the direction of the next target of the observing program, requiring only fine pointing adjustments by hand. Select "HD" to stake out using angle and distance, or "XYZ" to stake out with 3D coordinates. Also, read: What Is Transit Theodolite | Theodolite Parts. SET1X SET2X SET3X SET5X Total Station SETX. The total station is then mounted at the three-pin tribrach and internally leveled with either level vials or digital dual-axis methods, depending on the kind of the instrument. Press F1 (Programs) 3. The most frequently used surveying instrument today is the total station (As per below figure No1). The Ontario Ministry of Transportation (MTO) released the Connecting the GGH: A Transportation Plan for the Greater Golden Horseshoe to provide a 30-year vision for enhanced mobility within and across the Greater Golden Horseshoe (GGH), including future expansion plans for the Ontario Line. Professionalism is something sometimes overlooked, but NOT with these guys. Step 4: Attach the Tribrach and Coarse Level the Tripod Over the Benchmark. Great Piece of Information. Lets take a look at the steps involved to properly set up and level the Trimble Total Station. Step 3. Control points established by resection methods . Utilizing the telescope tangent screw and the tangent screw, center the eyepiece lens vertically and horizontally on the prism with the cross hairs centered on the prism. 2b). Tip. The [37] By November 2022, the completion date was being reported as 2031. When the stakeout is done, the station/offset dialog appears for staking the next point. [34] On November 9, 2022, Metrolinx and Infrastructure Ontario awarded the contract to Ontario Transit Group, a consortium including Ferrovial, VINCI, AECOM, GHD, among others, with a projected completion date of 2030.[35]. This turns 4Site Survey into an advanced mouse or digitiser This video will go through how to level the total station, perform a free station set-up, a control point set-up and set out given coordinate points. Place the total station in the spot from which you want to stake out points after you have finished entering the coordinates for the area into the total station's internal memory. The TinySurveyor: a Robotic Land Surveyor. Use this method when you want to quickly set out a large number of pegs and maintain accuracy over a large area. leave the THUMBS UP!!! Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. That is, the exact length, width, depth, and position of the foundation trenches must be marked on the ground. When you are satisfied with the results stake it and have the rodman write the cut or fill on the stake. Coordinate calculation. Select . [60][61], Moss Park station will be located at the northwest corner of Queen and Sherbourne Streets next to the Moss Park Arena.
Record angle and distance observations in the field. It combines the functions of a theodolite with that of a transit level and electronic distance meter (EDM). This manual contains important safety directions as well as instructions for setting up the product and operating it. Setting out levels using a DTM surface model. Enter the coordinates of the point that you want to stake out (which the device should do automatically). It's a step by step guide in which you will see how to mark a. Manufacturer Nikon-Trimble Co., Ltd. Technoport Mituiseimei Bldg. The Ontario Line station will have centre platforms and two entrances. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. A total station is an optical surveying instrument that uses electronics to calculate angles and distances. Using the collimator (a crude sighting device) on the top of the total station instrument, align the total station with the prism. Schabas supported using lighter metro vehicles such as those used in London's Docklands Light Railway, as such vehicles were deemed more suitable for steeper grades and elevated structures. The program How to use a total station steps are as follows. [21], The announcement that the line would extend to a new station at Ontario Place stirred controversy, as Premier Doug Ford had spoken of transforming Ontario Place, previously a family-oriented venue, into an adult-oriented casino complex. PLT 300 layout tool. One entrance will be at the northeast corner of Queen Street and University Avenue. Find out What is a Total Station? Exactly how you setup and configure the system depends on the task. Electronic Total Station SOKKIA USA Additional things to be considered in the range of a particular total station include robotic search controllers, measurement time, integrated laser scanners, integrated GPS, internal digital camera, internal data storage capability, inner COGO and stakeout capacities. Spread out the tripod legs evenly, about two to three feet for each leg, and center it over your benchmark stake. Schlouch Incorporated's use of Trimble Robotic Total Stations, Trimble GPS (Global Positioning System) and GPS equipped field machines ensures . The next number is the beginningstationnumber. Using a total station, you can easily capture important measurements for land surveying, construction and many other projects. ", "Ford's transit plan takes Toronto forward", "Ontario Line deviates from relief line more than previously thought: report", "Mayor John Tory throws support behind Ontario Line as province drops subway upload", "Council votes to approve transit expansion deal with the province", "Requests for Qualifications Issued for Ontario Line", "Contract Awarded for Ontario Line RSSOM Package", "Contract Awarded for Ontario Line South Package", "Requests for Qualifications Issued for Ontario Line North", "GTA $11-billion Ontario Line may not open until 2030, three years later than Ford's initial promise", "Exhibition & Corktown ready for future Ontario Line construction", "Experts cast doubt on deadline, budget in Ontario Line business case", "Attachment 4 Assessment of Ontario Line", "Updated Ontario Line plans from the Don River to Gerrard: Maximizing space within the existing GO rail corridor", "Ontario Line Initial Business Case July 2019", "Updated plans for the Ontario Line's North segment: A better fit for the community", "The Ontario Line Neighbourhood Updates East Segment", "Zooming in on Ontario Line plans from Osgoode to the Don River Delivering a line below Toronto's Queen Street that's been anticipated for more than a century", "Zooming in on Ontario Line plans from Exhibition to Spadina: Travel time savings and heritage protections", "East York site selected for Ontario Line maintenance and storage facility", "Metrolinx signs $50M deal for new Thorncliffe Park Islamic centre amid opposition to Ontario Line rail yard", "How Doug Ford's $28.5-billion transit overhaul compares with Toronto's existing plans", "Ontario Line: A world of role models available for subway planners", "Notice of Completion Notice of Completion of Environmental Project Report Relief Line South, City of Toronto and Metrolinx Transit Project Assessment Process", "The Ontario Line Neighbourhood Updates North Segment", "The Ontario Line (North) - LIVE Meeting", "People worried about the loss of a No Frills to new Toronto subway station", "Province plans new transit hub for Ontario Line, including a 'Union Station to the east', "Refined Ontario Line plans will better serve communities of Riverside, Leslieville", "The Ontario Line Neighbourhood Updates Downtown", "Key downtown stretch of Queen St. could close for nearly five years for Ontario Line construction", "Metrolinx releases detour plans to keep people moving during Ontario Line Queen Street construction", "Ontario Line Downtown Stations Temporary Road Closures and Community Impacts", "Ontario Line Osgoode Station - Station Headhouse Location Review", "Osgoode Hall trees can come down; Court refuses to hear Indigenous group's appeal", "Metrolinx ordered to halt tree removal, once again, at Osgoode Hall", "The Ontario Line Neighbourhood Updates West", "Ontario Line station footprints from Exhibition to Queen and Spadina reveal quick connections to major transit lines", "Connecting the GGH: A Transportation Plan for the Greater Golden Horseshoe", Ontario Line: Initial Business Case: July 2019, https://en.wikipedia.org/w/index.php?title=Ontario_Line&oldid=1142108303, Integrated with station under construction at, West side of Don Mills Road north of Gateway Boulevard, On Overlea Boulevard over Thorncliffe Park Drive West, Integrated with an existing station at Pape and Danforth, Located at the intersection of Queen Street East and GO Transit's Lakeshore East / Stouffville rail corridor, Located along GO Transit's Lakeshore East / Stouffville rail corridor between Eastern Avenue and the Don River, Under Queen Street East between George Street and Sherbourne Street, Integrated with an existing station at Queen Street and, Integrated with an existing station at Queen Street West and University Avenue, Rolling stock, to be built by consortium member, Maintenance and storage facility for the rolling stock, and an operations and control facility, Train operations, including using an automated, Systems including track, signalling systems, CCTV, passenger information, A 6-kilometre (3.7mi) tunnel through downtown Toronto from Exhibition to Don Yard portal (west of Don River), Seven stations including four new standalone underground stations (King-Bathurst, Queen-Spadina, Moss Park, Corktown), two underground interchange stations (Queen-Yonge and Osgoode) and one above-ground station (Exhibition), Other civil engineering work (including emergency exits) prior to mechanical and electrical systems installation by the RSSOM contract, 3 kilometres (1.9mi) of tunnel underneath Pape Avenue, Two underground stations one standalone (Cosburn) and one interchange (Pape), Five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemingdon Park, Science Centre), including connections to. Import the total station data Spectra Precision Survey Office Tutorial - Importing Total Station Data 6 . Selection of a particular model, together with the associated data collector and. Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. Each maker may have varied models, together with optional features which may be tailored to local working conditions, such as accuracy requirements, project size (EDM distances), and also accessible crew size. 1.
Setting-Out Points Using the Total Station Interface in As-Built for How To Use a Total Station? - EngineerSupply The item "Leica TCRP1203 3 R300 Robotic Total Station art 737469 gogo stakeout" is in sale since Saturday, June 2, 2018. The line would jog south to Overlea Boulevard and then jog west on the north side of that street on an elevated structure. Introduction. Utilizing the telescope tangent screw and the tangent screw, center the eyepiece lens vertically and horizontally on the prism with the cross hairs centered on the prism.
Toronto Union Train Station | Map & Adress - CANADA TRAINS pane displays. Ontario Line riders will be able to transfer to a 501 Queen or 510 Spadina streetcar at surface stops without having to fully cross a street. A safer, more efficient way to work. A traditional plumb bob provides this type of check if utilized in ideal conditions. Establishing the four corners in relation to the dimension of the building floor . The Total station is designed for measuring of slant distances, horizontal and vertical angles and elevations in topographic and geodetic works, tachometric surveys, as well as for solution of application geodetic tasks. Total station field techniques. [10], .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}, Plans for an eastwest downtown subway line date back to the early 20th century, most of which ran along Queen Street. A retail strip mall with a No Frills supermarket will be demolished to make way for the station structure. Metrolinx proposes using mitigation strategies involving "systems, maintenance and track design" to reduce noise and vibration, and new community spaces and parks "to offset (the) visual impact and footprint of the elevated structure". This contract will include construction of: On November 17, 2022, Metrolinx and Infrastructure Ontario issued an RFQ for the northern portion between the Don Valley Bridge and Ontario Science Centre.